Crack Sealing Reinvented
Two Color Options
Black for Asphalt
Gray for Concrete
Easy to Use
10 minute start up & cleanup.
- No need for precise temperature control.
Water cleanup.
Seal any day over 40°F. Even after rain!
No burn protection required.
- Open to traffic within 15 minutes.
Reliable
- Meets ASTM Specifications:
ASTM 6690 Crack Sealants
ASTM C920 Joint Sealants
400°F Melting Temperature – withstands summer heat
Cost Saving
- No costly kettle and wand required.
- Seal 50% more per man hour.
- Zero waste.
- No need to overband = less material needed.
Near-zero fuel cost.