Manhole Collar Repair in One Lane Closure

Water-Activated Patch for Water, Sewer, and Public Works Crews

Watch City of Tampa rebuild a manhole collar and open the lane the same shift. Then request your free pail below.

No hot mix plant, no second trip. Pour, compact, wet, open the lane.

Every frame you raise, reset or replace leaves a ring of broken pavement around it.

Perma-Patch Aqua™ closes that ring the same shift. Pour it from the pail, compact it, wet it, open the lane. No hot mix plant, no ton minimum, no second trip.

Your free sample: one 50 lb pail of Perma-Patch Aqua™, the patch in the video.

Your sample
Email Consent

Download the Aqua submittal package for your superintendent (PDF)

Tampa Has Been Doing This for Ten Years

The City of Tampa has been closing manhole collars with Perma-Patch® since 2016. Those first collars, in active travel lanes, are still tight after ten Florida summers, and not one treated frame has come back on a work order. Tampa has since moved its collar work to Aqua, the water-activated version.

City of Tampa crew member with a hand on a Perma-Patch manhole collar placed in 2016

10+ years, no return work orders

The 2016 collars were inspected with the covers off. Flush with the lane, no settling at the frame, and the frame reset budgeted for them was never needed.

Read the 10-year Tampa study

Perma-Patch Aqua placed around a City of Tampa sanitary sewer manhole frame

About 50% less material

On a north Tampa lane, a failed sanitary sewer collar was rebuilt with Aqua, a hose and a plate compactor, using about half the material by weight of twelve 60 lb bags. The lane opened when the crew finished.

Read the Tampa Aqua collar study

2016 Perma-Patch manhole collar sitting flush with a Tampa travel lane
Crew inspecting a 2016 manhole collar at the centerline of a Tampa street
Crew inspecting a 2016 manhole repair on a residential Tampa street

The 2016 Tampa collars at inspection, ten summers after they went in.

One Collar, Start to Finish

Mortar collar troweled around the manhole frame to bring it to grade

1. Square it up, set the frame

Saw-cut around the frame, pull the broken ring and bring the frame to grade with your mortar. No waiting on the mortar.

Crew member pouring Perma-Patch Aqua straight from the 50 lb pail

2. Pour from the pail

Aqua goes straight from the 50 lb pail into the ring. No heating, no mixing.

Perma-Patch Aqua spread out to the edges of the saw-cut

3. Spread to the cut

Shovel it out to the saw-cut edges all the way around the frame.

Crew raking Perma-Patch Aqua level with the surrounding lane

4. Rake to grade

Rake it level with the lane, slightly high so compaction brings it flush.

Water applied over the placed Perma-Patch Aqua to activate it

5. Wet it

About a pint of water per pail activates the set. A hose or a bucket works, before or after compaction.

Plate compactor running across the Perma-Patch Aqua collar

6. Compact, open the lane

Plate compactor or hand tamp. Sweep, pull the cones and open the lane.

Traffic passing over the finished Perma-Patch Aqua manhole collar in Tampa

Traffic back over the finished collar in Tampa.

Why Crews Stop Waiting on Hot Mix for Collars

Hot mix for one collar

  • Plant batch, ton minimums.
  • Plant closed weekends and all winter.
  • Needs a dry hole.
  • Leftover load goes to waste.
  • A second trip to finish.

Aqua from the shelf

  • No minimums. Use only the pails the collar needs.
  • Pails ride on the truck, ready for the next collar.
  • Works 0°F to 120°F, in rain, snow or standing water.
  • Water is what activates it.
  • Unopened pails keep 1 year on the shelf.
  • The lane opens after compaction.

“You’re hosing down a fresh patch. It’ll wash out.”

That is the right instinct for asphalt, and it is why most cold patch fails around a frame: the joint is wet more often than it is dry.

Aqua works the other way. It is polymer modified and water activated, so the water is the trigger, not the contamination. Extra water does not hurt it. That is why it fits manhole work, where the ring around a sanitary frame is rarely dry.

The Numbers Your Superintendent Will Ask For

  • Package: 50 lb pail, 36 pails per pallet (SKU PPAQ-50-P)
  • Coverage: about 5 sq ft per pail at 1 inch deep
  • Depth: 1/4 inch minimum, no practical maximum, place in 3 inch lifts
  • Bonds to: asphalt, concrete, steel and aggregate base
  • Working range: 0°F to 120°F, including rain, snow and standing water
  • Traffic: immediately after compaction
  • Shelf life: 1 year unopened
  • Solvents and VOCs: none
  • DOT approved

Questions Crews Ask

Can our own crew do this, or do we need a paving contractor?

Your crew. The Tampa collar took a saw, a shovel, a rake, a plate compactor and a hose. No paving crew, no hot mix truck, no special equipment. If they can set a frame, they can close the collar the same shift.

How many pails does one collar take?

About 5 sq ft per pail at 1 inch deep. Measure the saw-cut square, subtract the frame, multiply by depth in inches, and divide by 5. The rep who ships your free pail can size a full season of collars from your work order count.

Who is using it now?

The City of Tampa. Its crews have closed collars with Perma-Patch since 2016 and now use Aqua for that work.

Do we have to wait for the mortar to set?

No. In Tampa the Aqua went in on the same shift as the mortar collar. That is one lane closure instead of two.

Will it hold up under traffic turning over the frame?

The lane opens after compaction. The 2016 Tampa collars, placed in active travel lanes, are still tight after ten summers with no return work orders.

Where do we buy it?

Through our distributor network, which includes the waterworks and industrial supply houses many utilities already buy from. Find the nearest stocking location by ZIP code on the Where to Buy page.

Close Your Next Collar the Same Shift